Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13707562

- Product Categories
- Friendly Links
Information Name: | Supply silicon PU Stadium |
Published: | 2015-04-23 |
Validity: | 30 |
Specifications: | |
Quantity: | 100000.00 |
Price Description: | |
Detailed Product Description: | Thickness 5.0mm 8.0mm light type surface morphology useful life of more than 10 years Floor features it has extremely excellent weather resistance, abrasion resistance, water resistance, followed by sex; a variety of colors; slip surface treatment; good flexibility, good weather resistance , easy cleaning and maintenance easy maintenance repair. Scope ① court, tennis court, basketball court, volleyball and other sports; ② children's playground, kindergarten activities, games; ③ pedestrian trails, community, playgrounds ...... and other color coating. ① waterproof layer construction technology: the ground need to have good waterproof (waterproof layer), outdoor courts must do more than 5cm of bitumen; ② prime handle: according to the situation well polished elements, repair, removal; ③PU Primer: asphalt, respectively (concrete) surface coated with PU primer, primer coating should be uniform, the asphalt surface of the base should be about 12 hours curing, curing concrete should finish at the end of 1-2 hours; ④PU coating: primer to be completely cured, PU coating can be in a trowel, and enhance the wear resistance of the ground; ⑤PU finish: PU paint with a roller, paint roller surface silicon PU two, so that the ground dustproof and waterproof, abrasion resistant, easy to clean The whole ground color uniform after the completion; ⑥ crossed: the court in accordance with the standard white, yellow paint with 50mm PU crossed; ⑦ construction complete: three days before construction is completed and put into use. (With 25 ℃ prevail, low opening time to be appropriately extended, not cleaning the bathroom floor during curing) ⑧ throughout the construction process in case of rain should immediately stop the construction in time to take protective measures and conservation. Specifications Item Index Elongation at break% ≥90% ≥20 rebound values ??of tensile strength Mpa ≥0.7 Tensile strength / Mpa ≥25% ≤95 compression recovery rate of hardness (Shore D) 45 to 60 flame retardant (Level) 1 |
Admin>>>
You are the 10405 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Yue Yue Floor Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 10405 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Yue Yue Floor Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility